High Efficiency & Low Operating Costs
Here’s a sampling of some of the many projects we’ve completed over the years.
Many are new installations, some are retrofits, others are control upgrades to existing systems.
The one thing they all have in common is improved efficiency and reduced operating costs. Nice.
3kw grid tied photo voltaic solar system.
120 gallon buffer connected to a radiant floor heating system and 2 air to water heat pumps.
Buffer tanks used to store chilled/ heated water for wine processing.
3 ton geothermal heat pump system heating radiant floors.
Tekmar zone controllers and PLC (programmable logic controller) relay for customized operation of 2 air to water heat pumps.
PLC controller operating an air to water heat pump that heat DHW, radiant floors and a air handler that provides cooling in the summer. The heat pump will also heat the future hot tub.
Tekmar control system for a radiant floors heated by an air to water heat pump. Remote thermostats with temperature sensors in drywall.
The system is a 5 ton geothermal Waterfurnace heat pump with five solar panels. The solar system will heat the house, domestic hot water and hot tub. When the solar is not enough the heat the water the heat pump automatically handles the loads. In the summer when there is to much heat being generated from the solar system the extra heat is dumped in the ground loop to be stored until it is needed.
The system is a 5 ton geothermal Waterfurnace heat pump with five solar panels. The solar system will heat the house, domestic hot water and hot tub. When the solar is not enough the heat the water the heat pump automatically handles the loads. In the summer when there is to much heat being generated from the solar system the extra heat is dumped in the ground loop to be stored until it is needed.
The system is a 5 ton geothermal Waterfurnace heat pump with five solar panels. The solar system will heat the house, domestic hot water and hot tub. When the solar is not enough the heat the water the heat pump automatically handles the loads. In the summer when there is to much heat being generated from the solar system the extra heat is dumped in the ground loop to be stored until it is needed.
Tekmar control system added to an existing air to water heat pump with a gas backup heating radiant floors
3kw electric boiler heating a radiant floor for a wood shop.
radiant floor piping that will be covered with an 1.5" layer of concrete.
radiant floor piping that will be covered with an 1.5" layer of concrete.
radiant floor piping that will be covered with an 1.5" layer of concrete.