High Efficiency & Low Operating Costs
Here’s a sampling of some of the many projects we’ve completed over the years.
Many are new installations, some are retrofits, others are control upgrades to existing systems.
The one thing they all have in common is improved efficiency and reduced operating costs. Nice.

Tekmar zone controllers and PLC (programmable logic controller) relay for customized operation of 2 air to water heat pumps.

PLC controller operating an air to water heat pump that heat DHW, radiant floors and a air handler that provides cooling in the summer. The heat pump will also heat the future hot tub.

Tekmar control system for a radiant floors heated by an air to water heat pump. Remote thermostats with temperature sensors in drywall.

The system is a 5 ton geothermal Waterfurnace heat pump with five solar panels. The solar system will heat the house, domestic hot water and hot tub. When the solar is not enough the heat the water the heat pump automatically handles the loads. In the summer when there is to much heat being generated from the solar system the extra heat is dumped in the ground loop to be stored until it is needed.

The system is a 5 ton geothermal Waterfurnace heat pump with five solar panels. The solar system will heat the house, domestic hot water and hot tub. When the solar is not enough the heat the water the heat pump automatically handles the loads. In the summer when there is to much heat being generated from the solar system the extra heat is dumped in the ground loop to be stored until it is needed.

The system is a 5 ton geothermal Waterfurnace heat pump with five solar panels. The solar system will heat the house, domestic hot water and hot tub. When the solar is not enough the heat the water the heat pump automatically handles the loads. In the summer when there is to much heat being generated from the solar system the extra heat is dumped in the ground loop to be stored until it is needed.